|
Carlson Surface Mining
| Surface Mine Pit Design and Reserves Webinar | This webinar is presented by Grant Wenker, and was originally broadcast
on Jan 10, 2008.
Learn how Carlson Mining helps design complex surface mines as well as schedule equipment timing with Grant Wenker, Carlson Mining Software Sales and Support. He'll show how to create and layout pits, assign direction and label names. See how the Carlson Surface Mining Module automatically subdivides the pits further and identifies by ownership for instant lease and royalty calculations.
See how the Carlson Surface Mining Module uses 3D Pit designs to calculate offset bench quantities with laybacks. Then using these true, 3D volumes, Surface Equipment Timing will schedule through these multi-bench pits in 3D for precise mine planning.
| Size: 52,457,848 bytes | Date: Jan 10, 2008 | Length: 1 Hour |
| | Natural Regrade Webinar | This webinar is presented by Nicholas Bugosh, the creator of Natural Regrade, and
was originally broadcast on August 31, 2007. In this webinar Nicholas demonstrates
Natural Regrade's incredible ability to design surfaces that drain the way nature
designed, with minimal erosion. Unique in the industry, Carlson Natural Regrade
is an amazing solution to one of the key challenges of site design.
For more information on Carlson Natural Regrade, click here.
| Size: 54,348,888 bytes | Date: August 31, 2007 | Length: 1 Hour |
| | Spoil Polylines and Volumes | Spoil Polylines and Volumes.wmv
| Size: 32,612,119 bytes | Date: Nov-18-2011 | |
| | Surface Production Timing | Surface Production Timing.wmv
| Size: 18,553,833 bytes | Date: Nov-18-2011 | |
| | Design Bench Pit with Tag slope groups | Design Bench Pit with Tag slope groups.wmv
| Size: 74,552,745 bytes | Date: Nov-18-2011 | |
| | Timing Project Manager for Surface Mining Equip and Calendar | Timing Project Manager for Surface Mining Equip and Calendar.wmv
| Size: 28,133,127 bytes | Date: Nov-18-2011 | |
| | Cut and Place Range Diagrams | Cut and Place Range Diagrams.wmv
| Size: 45,909,225 bytes | Date: Nov-18-2011 | |
| | Haul Truck Cycle Time and Production | Haul Truck Cycle Time and Production.wmv
| Size: 41,377,375 bytes | Date: Nov-18-2011 | |
| | Pit Layout by Advance and Matrix | Pit Layout by Advance and Matrix.wmv
| Size: 31,218,981 bytes | Date: Nov-18-2011 | |
| | Spoil Placement Timing | Spoil Placement Timing.wmv
| Size: 43,087,451 bytes | Date: Nov-18-2011 | |
| | Surface Equipment Timing | Surface Equipment Timing.wmv
| Size: 62,867,025 bytes | Date: Nov-18-2011 | |
| | Design Bench Pit Offset with Ramp | Design Bench Pit Offset with Ramp.wmv
| Size: 51,950,491 bytes | Date: Nov-18-2011 | |
|
|