Upgraded from 2010 to 2011. When I import a small .txt file of the days work into existing large file where all the points and symbols have been resized and fixed, the new file import with F2F forces a redo of everything and resets all the work I already fixed.
I unchecked the erase existing F2F entities under the F2F box with no help. The only way it works is if I enter the new point numbers in the points to F2F box.
With the previous versions it was automatic and only F2F the new stuff. I must be missing a box or check mark somewhere.
Thanks
John