I asked this question on RPLS.com a while ago, and still haven't found an
answer:
I topo-ed a site, using a control file with traverse points with assumed
elevations.
I then ran a benchmark in, and corrected my traverse point elevations in the
drawing.
I opened the rw5 file and deleted all the traverse point coordinates and
elevations.
But every time I process the file, and then use FTF - I see that the assumed
elevations were used for some of the shots instead of the elevations in the
dwg.
I then go back into the rw5, and see that some point coordinate and
elevations are still there. I know that I had deleted all of them.
I do this about 5 more times until it finally comes out right.
Anyone else have this happen? Is there any way to "fix" it?