We have a underground gas pipe and the length does not match the center-line because of the vertical differences going up and down.
My question is how do we find the PI points of the pipe profile in reference to the Center-line Stationing?
We basically have two center-lines with of different lengths but are still starting and ending at the same place.
But I want our Vertical PI's to match the Stationing on the ground.