In the mining module, I have my strata with qualities defined in my
drillholes. I want to assign a new bed name (or strata name), beginning at
the top of the hole and adding strata below until the composite strata
reaches a quality limit. My strata is all entered in 1' increments. I
would like for it to be able to subdivide the strata that forces my new bed
or strata to the quality limit, so that I can maximize the acceptable
material.
Does this option or anything similar exist?
Mike Ricci