Click to download | | Surface Timing Basics |
The Carlson Surface Mining Module contains the necessary tools for complex surface
mine design, mineable reserve calculations and scheduling with equipment timing. The
typical progression of the steps would be to create and layout pits, calculate reserves,
then schedule the mine. This session will cover creating and laying out pits, assign
mining directions, calculating pit reserves, assigning quantities and qualities and
production timing.
Presenter:
Dinesh Malav, Software Engineer
User Training Conference 2010 | | Size: 1,246,462 bytes | Date: 2010 |
|