This session covers the more advanced options found within Surface Equipment
Timing. Equipment and Calendars will be defined. Multiple benches with offset, sloped
quantities will be scheduled with 3D pick interaction of the sequencing. Period grids will
be out put to see the mine progression in 3D. Drawing Events will be used to trigger
events. Pit Attributes will be used for detailed reporting. The short range Pit Scheduler
will be used for small pits to schedule multi-bench short range plans.