| | Spoil Polylines and Volumes | | Spoil Polylines and Volumes.wmv
| | Size: 32,612,119 bytes | Date: Sep-13-2011 | |
|
| | Surface Production Timing | | Surface Production Timing.wmv
| | Size: 18,553,833 bytes | Date: Sep-13-2011 | |
|
| | Design Bench Pit with Tag slope groups | | Design Bench Pit with Tag slope groups.wmv
| | Size: 74,552,745 bytes | Date: Sep-13-2011 | |
|
| | Timing Project Manager for Surface Mining Equip and Calendar | | Timing Project Manager for Surface Mining Equip and Calendar.wmv
| | Size: 28,133,127 bytes | Date: Sep-13-2011 | |
|
| | Cut and Place Range Diagrams | | Cut and Place Range Diagrams.wmv
| | Size: 45,909,225 bytes | Date: Sep-13-2011 | |
|
| | Haul Truck Cycle Time and Production | | Haul Truck Cycle Time and Production.wmv
| | Size: 41,377,375 bytes | Date: Sep-13-2011 | |
|
| | Pit Layout by Advance and Matrix | | Pit Layout by Advance and Matrix.wmv
| | Size: 31,218,981 bytes | Date: Sep-13-2011 | |
|
| | Spoil Placement Timing | | Spoil Placement Timing.wmv
| | Size: 43,087,451 bytes | Date: Sep-13-2011 | |
|
| | Surface Equipment Timing | | Surface Equipment Timing.wmv
| | Size: 62,867,025 bytes | Date: Oct-18-2011 | |
|
| | Design Bench Pit Offset with Ramp | | Design Bench Pit Offset with Ramp.wmv
| | Size: 51,950,491 bytes | Date: Sep-13-2011 | |
|