| Spoil Polylines and Volumes | Spoil Polylines and Volumes.wmv
| Size: 32,612,119 bytes | Date: Sep-13-2011 | |
|
| Surface Production Timing | Surface Production Timing.wmv
| Size: 18,553,833 bytes | Date: Sep-13-2011 | |
|
| Design Bench Pit with Tag slope groups | Design Bench Pit with Tag slope groups.wmv
| Size: 74,552,745 bytes | Date: Sep-13-2011 | |
|
| Timing Project Manager for Surface Mining Equip and Calendar | Timing Project Manager for Surface Mining Equip and Calendar.wmv
| Size: 28,133,127 bytes | Date: Sep-13-2011 | |
|
| Cut and Place Range Diagrams | Cut and Place Range Diagrams.wmv
| Size: 45,909,225 bytes | Date: Sep-13-2011 | |
|
| Haul Truck Cycle Time and Production | Haul Truck Cycle Time and Production.wmv
| Size: 41,377,375 bytes | Date: Sep-13-2011 | |
|
| Pit Layout by Advance and Matrix | Pit Layout by Advance and Matrix.wmv
| Size: 31,218,981 bytes | Date: Sep-13-2011 | |
|
| Spoil Placement Timing | Spoil Placement Timing.wmv
| Size: 43,087,451 bytes | Date: Sep-13-2011 | |
|
| Surface Equipment Timing | Surface Equipment Timing.wmv
| Size: 62,867,025 bytes | Date: Oct-18-2011 | |
|
| Design Bench Pit Offset with Ramp | Design Bench Pit Offset with Ramp.wmv
| Size: 51,950,491 bytes | Date: Sep-13-2011 | |
|